COMPLETED PROJECTS
- Performed TI work with Link alignment on Lumbini, Gandaki, Bagmati and Narayani of Huawei and ZTE equipment with INTELCO Pvt. Ltd and GTL Nepal Pvt. Ltd respectively.
- Worked with Vigor Technologies for some of the major NCELL Project on Seti,Narayani ,Bagmati, Gandaki, Dhaulagiri and Janakpur Zone and solved some critical issue(e.g:- JAN090,Which was fluctuating for more than 1 month and customer has suggested to change root either from JAN153 or JAN143 or JAN405 but due to LOS issue root could not be changed and later ourselves planned to change the root through JAN025 which was the only solution to prevent site from fluctuation and got success on it) and same case was on other region too.
- Performed Maximum number of M/W Link Alignment and their Traffic shifting along with Maximum number of IDU upgrading and replacement on Bagmati, Narayani, Lumbini, Gandaki, Bheri, Dhaulagiri, Rapti , Seti and Janakpur zone.
- Performed COW BTS of NCELL for vigor technology on Gadimai and Lumbini region.
- Performed 35 Hops M/W LOS survey for CERAGON equipment on Janakpur for Vigor technologies of NCELL PROJECT.
- Worked with B3 Engineering Pvt. Ltd. for IDU up gradation with E1 work in Lumbini zone.
Latest completed Project
- Performed COL site at Bagmati and Lumbini of NCELL for GTL Nepal. Pvt. Ltd.
- Performed Maximum number of Band and 3G Up gradation work with GTL on Lumbini and Narayani zone.
- Worked for Aviat Project in M/W link alignment on Rapti, Lumbini and Bagmati zone.
- Worked with M-each Pvt. Ltd for M/W dismantle project in Bheri , SETI and Narayani
- .Performed FO work with INTELCO Pvt. Ltd. On Birgunj, Hetauda, Narayangadh,Dhaulagiri.
- Performed VSAT link and its dismantle on Seti , Dhaulagiri and Gandaki zone of Ncell project collaborating with Vigor Technologies.
- Performed ATN installation of Huawei at Dhaulagiri.
- Worked For FLM (PM) project of NCELL on collaboration with GTL Nepal Pvt. Ltd at Rapti Zone.
- Worked with Vigor Technology and Niscom Technology for more than 60 Hops M/W link of ZTE and AVIAT networks with Traffic shifting from E1 to IPRAN project at Lumbini and Rapti.
- Worked with Dag’s on Techno Pvt. Ltd for optical work in lumbini region.
- Performed civil work in collaboration with Syangja Alamdevi Nirman Sewa.
Photo Gallery
-
-
Performing E1 activity
-
-
Performing IDU replacement work
-
-
Performing E1 activity
-
-
Total installation work
-
-
Performing T1 Activity
-
-
Performing Microwave works